Case Studies | 42 Technology

Advanced simulation helped optimise cooling tunnel design | 42 Technology

Written by Adrian Swinburne | Feb 16, 2014 5:42:00 PM

Our client needed a cooling solution with performance better than that achievable from current cooling tunnel products.

We worked in close collaboration with the client team and with their selected cooling tunnel supplier to enhance a basic tunnel design.

A combination of analysis, numerical simulation and experimental work helped us create a detailed thermofluidic simulation of the existing tunnel and an enhanced version with significantly improved cooling performance.

The principles of the enhanced design were then implemented by the cooling tunnel supplier with technical oversight by the 42T team.

The final tunnel design delivered significant improvements in performance in the factory and has been adopted as a key component in the client’s future manufacturing approach.

If you would like to find out more please contact Adrian Swinburne: