This presented the need for a high level of production operator recruitment and training at the start of each season, and resulted in increasingly high labour costs and variable operator performance.
By examining the operators’ tasks in detail, a series of specific operations were identified. This showed potential for a level of automation.
We created simple and low cost proof-of-principle automation rigs and fixtures. This allowed us to demonstrate of the increase in operational efficiency that could be achieved.
These demonstrations showed that best-in-class operator performance was achievable from all staff, as well as more consistent packing quality.
We also proposed a roadmap to get from the current setup to the more efficient semi-automated layout in a number of minimally disruptive steps.
If you would like to find out more, contact Director of Consumer, Robin Ferraby:
answers@42T.com | +44 (0)1480 302700 | Robin Ferraby | LinkedIn